Project management comparison

Kanboard vs Trac

Prices, documented capabilities and limits from dated official sources, side by side. Unknowns remain unknown; different billing units do not establish a cost winner.

What the evidence answers

A reading of reviewed official documentation for Kanboard and Trac. It is not a hands-on test, a ranking or a recommendation of one product.

Common buyer questions answered
3 requirements
Documented for one
3 requirements
Not verified for either
2 requirements
Prices
Not like-for-like yet

Price

  • Kanboard

    Free plan · paid prices not verified ·

    • Self-hosted: no subscription charge ·
  • Trac

    Free plan · paid prices not verified ·

    • Self-hosted: no subscription charge ·

A complete like-for-like price comparison is not established; the next steps say what is missing.

Common buyer questions answered

Even when labels match, check each source for differences in plans, units and scope.

Projects
Kanboard The documentation describes two project types: team projects with user and group management, and personal projects that belong to one person with no user management.
Trac Trac keeps its wiki pages, tickets, reports and settings in a Trac environment, which is a directory with a human-readable configuration file and other files and directories.
Teams
Kanboard Each user and each group can be given a project role of Project Manager, Project Member or Project Viewer; only administrators have access to everything.
Trac Trac has two built-in permission groups, authenticated and anonymous; custom groups can be defined to inherit their permissions, and permissions can be grouped into roles such as developer and admin.
Views
Kanboard The website describes a Kanban board where tasks are dragged between columns, columns can be added, renamed and removed at any time, and a column is highlighted when it is over its work-in-progress limit.
Trac The Trac 1.6 guide index lists Timeline, Repository Browser, Revision Log, Changesets, Roadmap, Ticket Queries, Batch Modify and Reports pages.

Limits to check

  • Kanboard The project describes maintenance mode, with no active feature development and occasional fixes.
  • Kanboard The requirements page lists SQLite, MySQL, MariaDB, PostgreSQL or (experimental) Microsoft SQL Server as databases and recommends PostgreSQL; it advises SQLite for a single user or small teams and not with NFS or Docker.
  • Trac Its revision-control interface covers Git and Subversion, alongside an integrated wiki, issue tracking and report facilities.
  • Trac When Subversion is used, Trac must be installed on the same machine as the repository; remote Subversion repositories are not supported.

Not verified yet

No reviewed evidence for either product on seats and exports.

Documented for one product only, shown in the table below: Kanboard: automation limits and tasks; Trac: issues.

Not verified means our reviewed sources do not establish it. It does not mean a product lacks the capability or that it costs nothing.

Side-by-side evidence

Documented values with their sources and check dates; requirements the sources do not establish stay marked.

  • Documented as supported
  • Documented as unsupported
  • Not verified Sources do not establish it
  • Not applicable
Documented scope and limits; unverified dimensions remain unknown.
RequirementKanboardTrac
Pricing
Free plan · paid prices not verified

Free plan · paid prices not verified

Who it is for
Kanboard describes project management software focused on the Kanban methodology.

Verified Nov 4, 2026 · Kanboard: kanboard-source

Trac describes itself as a minimalistic web-based software project management and bug/issue tracking system.

Verified Nov 6, 2026 · Trac: trac-project

Coverage limits
The project describes maintenance mode, with no active feature development and occasional fixes.

Verified Nov 4, 2026 · Kanboard: kanboard-security

  • Self-hosted The requirements page lists SQLite, MySQL, MariaDB, PostgreSQL or (experimental) Microsoft SQL Server as databases and recommends PostgreSQL; it advises SQLite for a single user or small teams and not with NFS or Docker.
Its revision-control interface covers Git and Subversion, alongside an integrated wiki, issue tracking and report facilities.

Verified Nov 6, 2026 · Trac: trac-project

  • Self-hosted When Subversion is used, Trac must be installed on the same machine as the repository; remote Subversion repositories are not supported.
Projects
The documentation describes two project types: team projects with user and group management, and personal projects that belong to one person with no user management.

Kanboard documentation, Projects (docs.kanboard.org/v1/user/projects/), captured 9 November 2026; supplier description, not a deployment or independent test. The page states that only administrators and application managers can create team projects.

Verified Nov 10, 2026 · Kanboard: kanboard-projects-20261109b

Trac keeps its wiki pages, tickets, reports and settings in a Trac environment, which is a directory with a human-readable configuration file and other files and directories.

Trac documentation (trac.edgewall.org, documenting release 1.6, the latest stable at capture) captured 9 November 2026; supplier description, not a deployment or independent test. Installation guide for Trac 1.6; no environment was created.

Verified Nov 11, 2026 · Trac: trac-install-20261109b

Automation limits
The website lists automatic actions that change the assignee, colours, categories and more based on events; it states no limit on the number of automated actions.

Kanboard home page captured 9 November 2026; supplier description, not a deployment or independent test. The captured page states no automation run quota.

Verified Nov 10, 2026 · Kanboard: kanboard-home-20261109b

Not verified
IssuesNot verified
The Trac ticket system provides a configurable workflow for how tickets are treated.

Trac documentation (trac.edgewall.org, documenting release 1.6, the latest stable at capture) captured 9 November 2026; supplier description, not a deployment or independent test. Ticket workflow page for Trac 1.6; no workflow was configured or tested.

Verified Nov 11, 2026 · Trac: trac-workflow-20261109b

Tasks
The website lists subtasks with time or complexity estimates, Markdown descriptions, comments, documents, colours, categories, assignees and due dates, and moving or duplicating tasks across projects.

Verified Nov 10, 2026 · Kanboard: kanboard-home-20261109b

Not verified
Teams
Each user and each group can be given a project role of Project Manager, Project Member or Project Viewer; only administrators have access to everything.

Kanboard documentation, Projects (docs.kanboard.org/v1/user/projects/), captured 9 November 2026; supplier description, not a deployment or independent test. The same page describes per-project custom roles with restrictions; their limits were not tested.

Verified Nov 10, 2026 · Kanboard: kanboard-projects-20261109b

Trac has two built-in permission groups, authenticated and anonymous; custom groups can be defined to inherit their permissions, and permissions can be grouped into roles such as developer and admin.

Trac documentation (trac.edgewall.org, documenting release 1.6, the latest stable at capture) captured 9 November 2026; supplier description, not a deployment or independent test. Permissions page for Trac 1.6; no group or permission was created.

Verified Nov 11, 2026 · Trac: trac-permissions-20261109b

Views
The website describes a Kanban board where tasks are dragged between columns, columns can be added, renamed and removed at any time, and a column is highlighted when it is over its work-in-progress limit.

Verified Nov 10, 2026 · Kanboard: kanboard-home-20261109b

The Trac 1.6 guide index lists Timeline, Repository Browser, Revision Log, Changesets, Roadmap, Ticket Queries, Batch Modify and Reports pages.

Trac documentation (trac.edgewall.org, documenting release 1.6, the latest stable at capture) captured 9 November 2026; supplier description, not a deployment or independent test. This is the documentation table of contents, so it shows which views are documented; none was opened.

Verified Nov 11, 2026 · Trac: trac-install-20261109b

Coverage note

Project repository documentation at the captured revision, 4 November 2026. No installation, account, task, support, security or performance test. Exact release, hosted services and third-party terms require separate review.

Kanboard home page captured 9 November 2026; supplier description, not a deployment or independent test.

Dated publisher project README captured on 5 November 2026; supplier description, not a deployment or independent test. Infrastructure, accounts, third-party services and managed offerings have separate costs and terms.

2 requirements without reviewed evidence here

Not verified means the reviewed sources do not establish it; it does not mean a product lacks it or that it costs nothing.

  • Seats Kanboard: not verified · Trac: not verified
  • Exports Kanboard: not verified · Trac: not verified

Next steps

  • Confirm Kanboard's paid plan prices, billing term and taxes on its official pricing page; only its free plan is verified here.
  • Confirm Trac's paid plan prices, billing term and taxes on its official pricing page; only its free plan is verified here.
  • Ask Kanboard about seats, exports and issues; our sources do not establish them yet.
  • Ask Trac about seats, exports and automation limits; our sources do not establish them yet.

Commissions never change costs, eligibility or rankings.